As the lifecycle of Brentwood Reservoir comes to an end, upgrades to the Wildflower Reservoir are required in order to decommission Brentwood Reservoir without having an impact on services.
Strathmore's Master Servicing Study completed in 2020 found the Brentwood water reservoir to be nearing its end of life. With plans to close the reservoir and upgrade the Wildflower Reservoir, there is a need for new watermain connection on Centennial Drive and an upsize of the watermain along Maplewood Drive.
Project Timeline
UPDATES September 2024 Help guide the new landscaping for Maplewood Drive. Access the survey here . May 2024 To prepare for the watermain construction and road realignment, the Town will be removing the aging poplar trees along Maplewood Drive. Public engagement on replacing the landscaping will start in the summer of 2024, with replacement to be completed in the fall of 2025. |
Project Details
Maplewood Drive Watermain Upsize & Centennial Drive Watermain Connection |
To accommodate the closure of Brentwood Reservoir, a new connection to the watermain line along Centennial Drive and the upsizing of the existing watermain line along Maplewood Drive between Centennial Drive and Brentwood Drive will ensure services continue and a flow capacity is maintained. While this work is being constructed, the Town also plans to realign Maplewood Drive, thereby increasing the pathway/landscaping area along the west side of Maplewood Drive, and providing specific areas for on-street parking. |