Pathway Lifecycle Program |
Scope
|
Budget
|
Timeline
|
Update
|
Annual program to maintain and improve our pathway infrastructure, including installing Rectangular Rapid Flashing Beacons (RRFB).
Locations to be determined once tender is completed.
|
$78,000
|
2025
|
Capital budget approved on December 4, 2024
|
|
Road Asset Management Program (RAMP)
|
Scope
|
Budget
|
Timeline
|
Update
|
Annual program to maintain and improve our roads infrastructure.
Locations to be determined once tender is completed.
|
$380,000
|
2025
|
Capital budget approved on December 4, 2024
|
|
Sidewalk Improvements |
Scope
|
Budget
|
Timeline
|
Update
|
Annual program to maintain and improve the sidewalk infrastructure.
Locations to be determined once tender is completed.
|
$200,000
|
2025
|
Capital budget approved on December 4, 2024 |
|
Splash Park Recirculation System |
Scope
|
Budget
|
Timeline
|
Update
|
Water is essential for life and installing a recirculation system will ensure the Town is responsible and a leader in the community of conservation.
|
$300,000
|
2025
|
Capital budget approved on December 4, 2024 |
|
Vehicle and Equipment Upgrades |
Scope
|
Budget
|
Timeline
|
Update
|
Identified in our lifecycle program, vehicles and equipment that require upgrades or those at the end of their lifecycle will be replaced.
2025 will see the replacement of the loader mounted snow blower, plow truck, and water truck and the installation of portable column lifts at the mechanics shop.
|
$983,000
|
2025 |
Capital budget approved on December 4, 2024
|
|
Water Reservoir Upgrades |
Scope
|
Budget
|
Timeline
|
Update
|
As the lifecycle of Brentwood Reservoir comes to an end, upgrades to the Wildflower Reservoir and watermains along Centennial Drive and Maplewood Drive are required in order to decommission Brentwood Reservoir without having an impact on services.
Visit strathmore.ca/reservoirupgrades for more information.
|
$5,300,000
|
2025
|
Capital budget approved on December 4, 2024
|
|
Waste Water Treatment Plant and Lift Station Infrastructure Maintenance and Upgrades |
Scope
|
Budget
|
Timeline
|
Update
|
Annual program to maintain and upgrade our water and wastewater infrastructure.
|
$645,000
|
2025
|
Capital budget approved on December 4, 2024 |
|